Notice of Temporary Road Closure for Subsurface Exploration
On Tuesday, June 3, 2025, between approximately 7:00 a.m. and 5:00 p.m., GeoEngineers will be conducting a subsurface exploration on the north side of the existing bridge on Wilderness Road over Deep Creek. This work is part of the planning process for the design of a replacement bridge and will involve evaluating soil and groundwater conditions in the area.
To perform this work, a truck-mounted drilling rig will be staged between the BNSF railway and the existing bridge structure. Due to the limited width of the bridge and the size of the equipment, Wilderness Road will be fully closed at the bridge during this time.
In the event of an emergency, the crew will be prepared to temporarily move the equipment to allow emergency vehicles and personnel to pass. Otherwise, the bridge will remain closed for the duration of the work.
A schematic drawing of the closure and work area is included for your reference.
We appreciate your understanding and cooperation as we work to improve infrastructure in the area. If you have any questions or concerns, please don’t hesitate to contact us.
Meeting Agendas
Wilderness Rd- Road Closure- June 3, 2025
Tuesday, May 27, 2025